Actually you do need a flat, certainly decent pitch. It's no surpise that Bath have stuggled this year given the shocking state of the Rec at the mo.rfcjoe wrote:Okay, well I admit I am using this argument to vent my view on the shite fest, which is known as rugby. They could play up Prospect park ffs! You don't need a good flat pitch to play rugby, but you do need that for football.
I think this thread may be of more relevance to Jimmy Kebe: http://hobnob.royals.org/forum/viewtopi ... =2&t=95103rfcjoe wrote:Well when Jimmy K gets back in the team, we need to make sure the South and North Stands are playable.
Wow! Just what I always wanted. ANOTHER thread about the state of the pitchHarpers So Solid Crew wrote:Jackson Corner wrote:It's the worst I have seen it at this stage of the season since we have been at the Mad Stad. A combination of egg chasers and terrible weather. It needs re laying in the summer but that can cost up to £250,000 Can you see the club doing that?
Yep, as it will be in the LI contract that the pitch is in playable condition. Perhaps the answer would be to extend the Stadium, then they could get more light into the grassed area.
It's a guaranteed revenue stream for when the stadium is not in use, which is good. I wonder whether we also get any money from the sale of food and beer in the concourse, and merchandise in the shop.rfcjoe wrote:Okay, well I admit I am using this argument to vent my view on the shite fest, which is known as rugby. They could play up Prospect park ffs! You don't need a good flat pitch to play rugby, but you do need that for football.
Maguire wrote:I agree the pitch was terrible but luckily the air quality was still moderate, which is where most of the football gets played.
If we stopped playing football too the grass would be perfect... what we need is a surface like the 70s Baseball Ground to help us.Jackson Corner wrote:It's the worst I have seen it at this stage of the season since we have been at the Mad Stad. A combination of egg chasers and terrible weather. It needs re laying in the summer but that can cost up to £250,000 Can you see the club doing that?
They've played twice around Christmas, and once at the end of January.Terminal Boardom wrote:I think I heard that it is 7 weeks since London Irish played at the Mad Stad. SO YOU CANT oxf*rd BLAME THEM!!!
HTH
RFC will play 15 games in the same period.Muskrat wrote:London Irish will play 8 fixtures during the grass non-growing season (Mid November to end of March) and have so far played seven of them.
That's 640 minutes, or over ten and a half hours of 30, 15 stone men kicking and rolling around on the pitch. None of this damage can be repaired without bringing in expensive lighting rigs, which we can't afford to do.
So before people start saying "it can't be the Rugby that's ruining the pitch", er yes actually, it can and it is.
If we can't afford to then how come these very rigs have been used this winter ?Muskrat wrote:
That's 640 minutes, or over ten and a half hours of 30, 15 stone men kicking and rolling around on the pitch. None of this damage can be repaired without bringing in expensive lighting rigs, which we can't afford to do.
Right, so instead of playing 15 games on the pitch during the period, we allow 23 - 53% more, and people still think this doesn't affect the pitch? Yes you can reverse the argument, but LI are RFC's tenants, not the other way roundworking class hero wrote:RFC will play 15 games in the same period.Muskrat wrote:London Irish will play 8 fixtures during the grass non-growing season (Mid November to end of March) and have so far played seven of them.
That's 640 minutes, or over ten and a half hours of 30, 15 stone men kicking and rolling around on the pitch. None of this damage can be repaired without bringing in expensive lighting rigs, which we can't afford to do.
So before people start saying "it can't be the Rugby that's ruining the pitch", er yes actually, it can and it is.
So 22.5 hours of 22 men kicking and sliding on the pitch.
Is it any wonder the pitch is so poor when LI want to use it?
Is it a coincidence that as the pitch deteriorates this season our results improve?
And without the rent from our tenants we would be even more strapped than at present...LI are RFC's tenants, not the other way round
Like Coventry's Ricoh Arena. They have solid roof panels at one end, but at the other end (the southern end of their stadium, they have clear panels to let the sunlight in. Such a simple thing incorporated into the design that the designers of our stadium overlooked.Harpers So Solid Crew wrote: which might involve replacing parts of the roof with transluscent panels instead of the current panels, cost, no idea, but it won't be cheap.
Wycombe Royal wrote:Like Coventry's Ricoh Arena. They have solid roof panels at one end, but at the other end (the southern end of their stadium, they have clear panels to let the sunlight in. Such a simple thing incorporated into the design that the designers of our stadium overlooked.Harpers So Solid Crew wrote: which might involve replacing parts of the roof with transluscent panels instead of the current panels, cost, no idea, but it won't be cheap.
You obviously don't understand what I am talking about then. I'm not talking about extending the roof out a bit further, I'm talking about having a clear roof instead of a solid roof above the south stand and south west corner. You can see it in this image.West Stand Man wrote:Wycombe Royal wrote:Like Coventry's Ricoh Arena. They have solid roof panels at one end, but at the other end (the southern end of their stadium, they have clear panels to let the sunlight in. Such a simple thing incorporated into the design that the designers of our stadium overlooked.Harpers So Solid Crew wrote: which might involve replacing parts of the roof with transluscent panels instead of the current panels, cost, no idea, but it won't be cheap.
Oh how wrong you are.
The original design of the stadium had transparent panels on the roof, bringing it in closer to the pitch. They have never been fitted, for cost reasons I believe. If you look at the front edge of the roof you can see the holes where the next supports were to have joined the existing ones. Result, more light (even clear panels stop some) and a soaking for the front few rows in each stand when it rains.

Users browsing this forum: Ahrefs [Bot], Google Adsense [Bot] and 57 guests